Aluminum, Magnesium, Brass, Bronze, Lead, Zinc Ingot Molds

schedule
2010-02-14 | 06:53h
update
2024-08-02 | 10:48h
person
sinomachine.org
domain
sinomachine.org

February 14, 2010 By Sen LiangAMP Leave a CommentAMP

Aluminum, Magnesium, Brass, Bronze, Lead, Zinc Ingot Molds
Aluminium Ingot Molds
Aluminum, Magnesium, Lead, Brass, Bronze and Zinc ingot molds
Advertisement

Aluminum, Magnesium, Lead, Brass, Bronze and Zinc ingot molds

SMI proudly clainms to have been supplying Aluminum ingot molds, Magnesium ingot molds, Lead ingot molds, Brass ingot molds, Bronze ingot molds, Lead ingot molds worldwide for nearly 28 years.

SMI customized many shapes and sizes of ingot molds.
These ingot molds can be used for many different types of metals such as Aluminum, Magnesium, Lead, Brass, Bronze and Zinc.

Production Process
The manufacturing of Sow Molds involves a precise and controlled production process:
1. Material Selection:
High-quality, heat-resistant alloys are carefully selected to withstand the extreme temperatures encountered during aluminum smelting, magnesium smelting, lead smelting, brass smelting, bronze smelting or zinc smelting.
2. Mold Casting:
The selected materials are cast into the desired mold shape using advanced casting techniques. This process ensures the formation of a durable and precisely engineered mold.
3. Heat Treatment:
The cast molds undergo heat treatment processes to enhance their heat resistance, durability, and overall performance in the demanding conditions of Aluminum, Magnesium, Lead, Brass, Bronze or Zinc smelting facilities.
4. Quality Control:
Rigorous quality control measures are implemented at various stages of the production process to ensure that each Sow Mold meets the required specifications and standards.
5. Customization:
The molds are customized according to the specifications provided by Aluminum, Magnesium, Lead, Brass, Bronze or Zinc smelting facilities, taking into account factors such as size, capacity, and specific operational requirements.

Delivery, Shipping, And Serving
We can provide DDP delviery service,
The lead time is 22 weeks from order replacement,
We ship them by ocean in 1x40HD,
We provide on-site installation service as days collection.

Advertisement

Imprint
Responsible for the content:
sinomachine.org
Privacy & Terms of Use:
sinomachine.org
Mobile website via:
WordPress AMP Plugin
Last AMPHTML update:
12.11.2024 - 22:08:27
Privacy-Data & cookie usage: